Return to index
The valley is at the "North" end of the main station.  It will eventually connect with an industrial area planned for the other side of the bridge at the north end of the valley.

plaster1

Two shots of the valley at the north end of the station.  The tunnels come from the helix and pass under the overpass along with a road coming from the station.

Valley1

"Dirt" color paint has been applied

valley2

Some grass is now growing.



The valley is finally done.  Here are two pictures from above:



And finally, two from under the bridge:




Return to index