The "Digital Evaluation Layout."
Part of the construction included a hidden stockyard for storing trains not
in use
Stockyard under construction
The stockyard is pitched to allow cars to roll freely into
the yard from the top. Also, there is a hatch for access to the back corner of the
layout. The helix to go from this level to the station level will go
around this hatch.
Our new ICE-1 in the stockyard
This is a view of the train drop-off/assembly area with
two trains. The S-Bahn is on the pass-through, whereas the Blue/Cream
BR 111 is on one of the train drop-off/assembly tracks. Note the start
of constuction of the catenary system.