Our main station (Hauptbahnhof) has approximately 2 meters of track for trains at the station. The station building is the Faller "Bonn Hauptbahnhof" kit.
Here we have the station level installed; only two
tracks
so far...waiting for some switches. Note the S-Bahn train in the
station
area and a commuter train going down the helix
Here the station level is almost complete. Cork
road
bed has been laid down and the four tracks for the station are in
place.
A larger station building will be placed where the current one is and a
platform
will be placed between the sets of tracks
Started plastering the area behind the station
We added a fifth track to the station. This is a dead end and is intended for use by commuter trains
Lighting has been applied to the station
Happy travellers have now populated the station
Here is our 103 in the station.
An E94 passing through.
Another shot of the 103.
Commuter train leaving the south end of the station
Stellwerke at the north end of the station
Overveiw of completed station with catenary installed
And a few shots from the other end: